The year before last, a drawing review meeting was held in Nanning. The client pointed at the facade and asked, what fire rating does this flexible stone have? The supplier answered very decisively, Class A. I asked one question: which model, which report, and was it tested as a single panel or as a system with adhesive. The room went silent for half a minute. The report that was later dug out was for another series of products from two years earlier, and the thickness was different as well.
When it comes to fire protection, the biggest fear is this phrase "Class A" being treated as a universal label. Materials have grades, assemblies have requirements, and buildings have classifications; if the three do not match, no matter how impressive the report, it is useless. This article works through three premises, and the tone will be somewhat conservative, because this type of question should not have a glib answer.
Three prerequisites—if any one is missing, do not proceed
The first prerequisite is the material. Flexible stone is a category, not a single product. Different series, thicknesses, backings, and surface coatings can lead to different conclusions on combustion performance. Saying "flexible stone is Class A" is like saying "steel is Q355": it sounds professional, but it is actually a meaningless statement.
The second premise is the building. The same panel, installed on the gable wall of a six-story residence, outside the core tube of a hundred-meter high-rise, or on the exterior corridor wall of a hospital, is subject to different clauses. Height, nature of use, and occupant density—these three determine the baseline of the material grade.
The third prerequisite is construction. How the panels are fixed to the wall, whether there is a cavity behind them, what material the insulation layer is, and whether there is sealing between floors—these determine what happens in a fire more than the rating of the panels themselves.
Only when all three prerequisites can be put in writing can we even discuss "whether it can be used." If they cannot be put in writing, I suggest not deciding on the material yet and clarifying the design criteria first.
Premise one: What exactly is this panel made of
The main material of flexible stone is inorganic mineral powder—quartz sand, ash calcium, cement and the like—modified with a small amount of high-molecular polymer, with a fiberglass mesh laminated in the middle and a coating on the surface. This system is mainly inorganic, so many people casually call it "non-combustible."
"Predominantly inorganic" and "fully inorganic" are two different things. The type and amount of polymer directly affect heat release and smoke production during combustion. Some products use a fairly high proportion of polymer for flexibility; others keep the organic component very low to meet fire-protection indicators, at the cost of the board being more brittle and heavier. This is a trade-off in formulation, not a matter of superiority in marketing.
So the right question is not "Is your product fire-resistant?" but "For this model, tested according to GB 8624-2012, what class is the result, and can you show me the report?" The model must match, the thickness must match, and the manufacturer must match.Flexible stone product categoriesEach series has corresponding technical documents, but technical documents are not the same as test reports; do not confuse the two.

GB 8624 classifies combustion behavior, not whether a material is fire-resistant.
GB 8624-2012 "Classification for Burning Behavior of Building Materials and Products" divides materials into seven grades: A1, A2, B, C, D, E and F. The A, B1, B2 and B3 grades commonly used in engineering practice follow an earlier convention; the two roughly correspond as follows.
| Common engineering terminology | Corresponds to GB 8624-2012 | What tests are mainly looked at | Plain-language understanding |
|---|---|---|---|
| A grade (non-combustible) | A1, A2 | Non-combustibility test, calorific value of combustion | Under the test conditions, it basically does not participate in combustion. |
| Class B1 (flame-retardant) | B, C | Single burning item test, oxygen index | Can be ignited, but flame spread is limited |
| Class B2 (combustible) | D, E | Single burning item test, flammability test | Participates in combustion; structural measures are required as a fallback |
| Class B3 (flammable) | F | No performance requirements | Generally not used in construction |
One thing must be clear when reading this table: the classification answers "how much does the material contribute to fire under specified test conditions," not "will this panel catch fire on your wall." The latter is a construction detail issue, and the material class is only one input among them.
One more practical detail. When the drawings say "Class B1," it is best to ask one more question: does that correspond to B or C? The test data for the two differ considerably, and the sampling basis during acceptance may also differ. For those marked "Class A," likewise ask whether it is A1 or A2; A2 is permitted to contain a small amount of combustible components—this is how the standard itself is set.
For the same panel, reports may give three conclusions
This is not an exaggeration. If the substrates submitted for testing are different, the conclusions will be different: some submit only the board, while others submit it together with the adhesive and base board, and the latter is closer to engineering reality. If the thickness is different, the conclusion may also be different—the fire growth rate of 3 mm and 5 mm is not on the same order of magnitude.
There are several report statuses you need to look at carefully. For commissioned testing, responsibility applies only to the samples submitted; for type testing, the report covers a model range; for expired reports, the formulation may already have been changed. When you see a report, first flip through three pages: check whether the commissioning party and the production unit on the first page are the same company, what model and thickness are stated in the sample description on the second page, and whether the conclusion on the last page limits the scope of application.
I once encountered a report whose conclusion page stated Class A2, with a line of small text in the remarks: applicable to samples not greater than 4 mm thick and without backing. The project used 6 mm panels with backing; strictly speaking, this report does not cover them. Details like this cannot be found without reading the remarks.
So for the fire safety conclusion on flexible stone, my position has always been: it is subject to the test report for the corresponding model, corresponding thickness and corresponding batch. Verbal promises do not count, and reports for other models do not count either.
Premise two: How tall the building is and how many people are inside
In the Code for Fire Protection Design of Buildings, 27 meters for residential buildings and 24 meters for public buildings are two commonly used dividing lines, and exceeding 100 meters is another tier. These figures determine the minimum grade of exterior insulation materials and also indirectly determine how "light" the facing system can be.
According to conventional criteria, for an external insulation system without cavities, residential buildings over 100 m must use Class A materials, 27 to 100 m may use Class B1, and below 27 m may use Class B2; for public buildings, the thresholds are 50 m and 24 m. Systems with cavities are stricter: above 24 m, Class A is required. For specific projects, these figures are subject to the version of the standard cited in the design documents and the review opinions, and local authorities also have detailed provisions.
Buildings with high occupant density are another category. For buildings such as hospitals, schools, shopping malls, passenger transport stations, and theaters, the combustion performance of exterior insulation materials is controlled at Class A; at the drawing review stage, there is basically no room for negotiation on this point. Such asGuangxi Binyang Litang Shunyi Zhiming HospitalFor a medical building like this, the material selection for the exterior wall system should be worked backward along this line from the scheme stage, rather than coming back to change materials after the facade is completed.

There is an easily confused point here: the "Class A" mentioned in the codes mostly refers to insulation materials, not the finish layer. The rating requirements for the finish layer depend on how the design documents reference them and how the drawing review determines them. Mixing the two terms "insulation" and "finish" is the starting point of many disputes. I have seen a change order that switched the finish material from coating to flexible stone on the grounds that "both are Class A," but the original design did not mention the combustion performance requirements of the finish layer at all, so this reason was actually empty.
Cavities: more decisive to success than the material itself
Curtain-wall-type construction has a cavity between the facing panel and the substrate wall. In a fire, this cavity acts as a vertical chimney, and flames and high-temperature smoke travel upward along it; a fire can spread from one floor to more than ten floors in just a few minutes. Therefore, codes impose stricter material grade requirements on systems with cavities; this is not conservatism, but a lesson learned from fires.
How to handle cavities involves several standard actions. Interfloor sealing is done at the floor slab position, with rock wool filling plus galvanized steel sheet support; steel sheet thickness and rock wool density are per design. A horizontal fire barrier is installed on each floor using Class A materials, with a height of not less than 300 mm. Locations where pipes and cables pass through are sealed separately; foam sealant must not be used as a one-step fix.
Flexible stone is directly adhered to cement pressure board or plastered substrate, which in theory constitutes no cavity or approximately no cavity. But this does not mean sealing can be omitted. If there is still insulation layer, framing, or leveling frame on the outside, cavities still exist, merely hidden behind the panels. The criterion is not "how the panel is attached," but "whether, from the finish to the structure, there is a continuous combustible surface and an externally connected cavity."
Another frequently overlooked point: the thickness of the protective layer outside the insulation layer. When using Class B1 and B2 insulation materials, the thickness of the protective layer on the first floor is usually required to be no less than 15 mm, and on other floors no less than 5 mm. The protective layer is the mortar applied outside the insulation board, and its integrity directly determines whether the insulation material inside can be ignited. This item is concealed work during acceptance inspection; once completed, it cannot be seen, so it must be inspected before plastering.
Premise three: Not falling off is harder to prove than not burning
Fire protection discussions easily fixate on "does it burn" and forget the other half: does it fall off. Flexible stone has an areal density of 3 to 5 kg per square meter, far lighter than stone, but a 300×600 panel falling from a height of 30 m carries enough impact energy to cause an accident. For exterior wall finishes on high-rise buildings, detachment and combustion are two parallel risks, not one primary and one secondary.
Bond strength is the core indicator. Design documents commonly specify not less than 0.4 MPa, and pull-off tests are performed on site by inspection lot; the specific value is subject to the drawings. This number may not look high, but to achieve it uniformly across an entire wall, every step must keep up: substrate treatment, interface agent, notch depth, compaction and curing.
Hollowing is a precursor to detachment. During acceptance, tap each piece with a small hammer; if the hollow area of a single piece exceeds one-tenth of the panel surface, it must be treated. Hollowing is not allowed at the four corners of door and window openings or at internal and external corners. This item is inRammed earth panelsFor products with this kind of thick texture, you need to watch even more closely; the back has large indentations, and adhesive scraping easily leaves voids.

There are a few more items to review together: the compatibility between the adhesive and the substrate, the strength retention after freeze-thaw cycles, the strength decay after prolonged water immersion, and the fatigue under repeated wind pressure. These data are not in the panel's test report; they are in the system's test report and the on-site pull-off records. I will not say that a certain system "never falls off"—no manufacturer can prove that. What can be proven is only this: for this batch of panels, this type of adhesive, and this type of substrate, on this project, what the pull-off value is.
Four documents, not one fewer
At the acceptance and fire safety filing stage, verbal assurances count for nothing; only paper counts. I usually require four documents; if one is missing, I write "to be supplemented" on the acceptance form, not "qualified".
- Combustion performance test reports for the corresponding model and corresponding thickness. The grade must be clearly stated as A1, A2, B or C, the report must be within its validity period, the commissioning unit and the production unit must match, and the scope of application in the remarks must cover the board used in this project.
- Test reports or type inspection reports for the system construction. A report for a single panel cannot demonstrate the complete system with adhesive, substrate and framing; this is especially important for curtain-wall-type construction.
- Compatibility data for adhesives and interface agents, as well as on-site pull-off test reports. Pull-off tests must be carried out by inspection lot, with test points marked on the floor plan; who tested, on what date, and what values were obtained must all be recorded.
- Fire protection design review opinion or filing documents, plus the design drawings' descriptions of insulation material grade, fire barrier zones, and protective layer thickness. If these items cannot be found on the drawings, a change notice or technical verification sheet must be issued; on-site crews must not rely on "doing it per usual practice."
Only when these four items are complete, together with the concealed works acceptance records, is a set of documentation considered closed.Qualifications and testing documentationYou can request it from the manufacturer, but note that what the manufacturer provides is product information, while the project needs information on this project, this batch and this construction; the two cannot replace each other.
Why I cannot give an “absolute” answer
People often ask me whether flexible stone can really be used on residential buildings over 100 meters. I cannot answer that with a single word. Whether the material grade is sufficient depends on the reports; whether the construction is compliant depends on the design; whether the work is done properly on site depends on the site itself; whether it will still hold firm after ten years depends on maintenance. Only when all four are multiplied together do you get a result; if any one of them is zero, the result is zero.
What I can offer is a set of checking sequence: first confirm the model and report, then confirm the building classification and clauses, then confirm the construction details and sealing, and finally confirm the adhesion and acceptance data. This order cannot be reversed. Doing it the other way around—choosing the material first and then finding reasons—will sooner or later get stuck at drawing review or acceptance.
One more honest point. When it comes to fire safety, the part a material supplier can be responsible for is very limited; the rest is in the hands of the designer and the contractor. The same panel, applied in a thin plaster system with no cavity versus hung on a curtain wall with framing and a cavity, does not behave the same way in a fire. So I do not recommend that the client use the two words "Class A" to persuade the drawing reviewer, nor that the design institute use the phrase "the material meets the standard" to replace construction details.
Change the question from "is this material fire-resistant" to "which clause does this construction, in this building, comply with", and the answer becomes specific. The former question has no answer; the latter does.