Home  /  Project Cases

Renovation and block update

PROJECTS · FLAT

FLAT renovation and block update materials, combined with project pictures and product center information to organize materials comparison, specification verification, substrate nodes, procurement and maintenance suggestions. The original project diagram, planning effect diagram and application plan are marked separately, and detection data is not falsely substituted for on-site measurement.

Content typeProject Collection and Material Selection Analysis / Material Application SchemeProduct DirectionFlexible stone as the focus · Taking into account gilded panels, faux stone paint and light-transmitting stonePrinciple of documentsRespectively explain the nature of the image, the source of parameters, and the scope of application.
Check products and parameters according to materials: flexible stone / gold plate / imitation stone paint / translucent stone

The texture, specifications, and testing data of the product are used for the current selection of materials, but do not directly prove that the original case actually uses the same model of product. First confirm the indoor and outdoor parts, base layer, color, and nodes, and then check the order and corresponding report.

Project Collection and Application Scheme

Planning effect drawings, construction stage photos, and product texture references, see the notes on each page; application plans are not counted as completed industrial achievements.

Old city area renovation and block update: selection and material checking

The first thing to address in the renovation of existing buildings is to answer 'which parts can be retained and which problems must be dealt with first'. The old surface may have undergone multiple repairs, and the base type, bonding status and water source may not be consistent. It should first be recorded according to the building and facade division, such as hollowing, cracks, spalling, efflorescence and adherents. Necessary inspections and treatments are determined by professionals. The new surface can only be constructed on suitable substrates and supporting systems, and thin materials cannot be used as a treatment measure to cover all the problems of the old walls.

When the neighborhood is still in use, the construction organization and material selection need to consider the operation of shops, the passage of residents, parking, and pipeline protection. It is necessary to demarcate an experimental area on site, check the retention range of windows, shop signs, awnings, and air conditioning brackets, and then arrange for demolition, repair, sample, and section construction. It is more useful to write clear preconditions, closure ranges, and re-inspection requirements for each section than to make a direct promise to complete the work in a few days, to avoid the wall that has been completed being damaged again by subsequent pipeline or sign construction.

Reading order of this type of content
QuestionVerification method
What is the nature of the image?Firstly, distinguish between actual shooting, construction stage, planning renderings, and product texture images, and do not treat the plan as performance
Which products are correspondingEnter each page of the product link to check the series and model, and confirm the sample; similar names do not mean the same supply record
Where does the data come from?Mark the original station quantity, product parameters, calculation examples, and test data separately
How to communicate furtherProvide actual dimensions, application location, and subgrade conditions, and request the corresponding samples and materials

View the complete product catalog·View the corresponding test original

FLAT · Guangdong Fulaite Building Materials Co., Ltd.

Make architecture more beautiful.

Focus on flexible stone (MCM soft stone/soft porcelain), providing texture selection, product information and order production coordination.

Copyright © 2012-2026 Guangdong Fulaite Building Materials Co., Ltd. All Rights Reserved Yue ICP No. 16084041

Headquarters Address:No. 2, West of Tong'an Avenue, Dongfeng Town, Zhongshan City, Guangdong Province
Public Security RecordGuangdong Public Network Security Preparation No. 44200002005257