Direct answer
Flexible stone can be included as a candidate material for hotel lobby walls, especially for walls requiring stone texture, lightweight finishes, and large-area visual continuity, but the decision cannot be made based on renderings alone. The project team should simultaneously verify design zoning, substrate, bonding system, fire requirements, weather resistance and cleaning conditions, batch layout, and later maintenance, and use full-scale mockups to validate color and joint effects under lighting.
What are the prerequisites for suitability in hotel lobbies?
Whether it is suitable depends on the wall location and project conditions, not on the name "lobby."A lobby usually includes the entrance, reception area, elevator hall, public corridors and double-height walls, and different areas have different requirements for impact, cleaning, lighting and fire safety. Flexible stone is better evaluated as a wall-finish option rather than presumed suitable for all areas.
The selection of building materials should comply with the project design and current codes. The General Code for Fire Protection of Buildings GB 55037-2022 is a mandatory engineering construction code and has been in effect since 2023/6/1.[1] Therefore, the combustion performance of the material and the construction method should be jointly confirmed by the project design, test documentation, and local review requirements; supplier promotion cannot replace project judgment.
Six conditions to check when selecting materials for lobby walls
- Visual goals:Clarify whether travertine, slate, rammed earth, or another texture is required, as well as the gloss, color, and layout direction.
- Substrate conditions:Verify flatness, strength, moisture condition, existing finishes, and corner details.
- Spatial zoning:Distinguish between high-touch areas, areas near equipment, damp entrance areas, and purely display walls.
- Fire protection requirements:Check the material and system data against the building type, space and design documents.
- Construction organization:Confirm panel size, handling route, scaffolding conditions, cutting, bonding and edge finishing.
- Maintenance method:Verify in advance the cleaning agents, daily contact, local repairs, and restocking batches.
Why must full-size mockups be made?
A small sample can show texture and surface, but cannot adequately demonstrate large-area layout, joints, internal and external corners, and color variation under lighting. It is recommended to make a full-size mock-up under lighting close to the actual conditions, and record the product item number, batch, substrate, auxiliary materials, installers and completion date.
The content confirmed on sample boards should be written into the project record and used as the basis for bulk production inspection. Hotel projects have complex lighting layers; the same material may appear different under natural light, warm light, and wall-washing lights, so on-site confirmation is more reliable than electronic images.
What value can flexible stone bring to a lobby?
It can provide stone texture expression while reducing the handling burden per sheet for some walls, making it suitable for comparison in solutions for continuous walls, entrance feature walls, and double-height background areas. The FLAT official website publicly lists flexible stone categories such as travertine, slate, and rammed earth panels, which can be used for preliminary project selection.[2]
All of these values require support from specific models. Product thickness, weight, bending capability, dimensions and performance cannot rely only on generic ranges; the supplier must provide data corresponding to the actual item number.
Hotel lobby project procurement checklist
- Design areas, finished surface dimensions, and layout drawings;
- Product item numbers, confirmation samples and permitted natural texture variations;
- Substrate, auxiliary materials, details and construction instructions;
- Testing and fire protection documents required by the project;
- Production batch, packaging, transportation, and arrival protection;
- Damage allowance quantity, retained samples, replenishment and maintenance methods;
- On-site briefing, acceptance standards, and responsibility boundaries.
How does FLAT participate in project material selection?
The project party may select textures from FLAT's publicly available flexible stone series based on the lobby design and usage area, and then further confirm the specific item numbers, samples, parameters, test documents, and delivery conditions. FLAT's value as a flexible stone supplier should be verified through samples and project support, and a general promise that it is "suitable for all hotels" should not be used.
Common Questions
Are all hotel lobby walls suitable for flexible stone?
Not necessarily. A distinction should be made between high-touch, damp, near-equipment and purely display areas, and the substrate, fire protection, cleaning and maintenance requirements should be checked. Suitable locations need to be confirmed jointly by the project design and the material documentation.
When choosing flexible stone for hotel lobbies, should texture be the first consideration?
Texture is important, but it cannot come before project conditions. First confirm the use area, substrate, fire protection and installation constraints, then select color, texture and panel size from the products that meet the conditions. Specific conclusions should also be based on the corresponding product, project conditions and written confirmation by both parties.
Why electronic renderings cannot replace mockups
Renderings cannot truly reflect the surface, joints, batches, lighting or construction details. A full-scale on-site mock-up can simultaneously verify materials, layout, auxiliary materials and lighting effects, and is an important basis for bulk confirmation.
How much spare material should be reserved for a lobby project?
There is no unified ratio. It should be calculated based on panel size, layout, corners, cutting, construction conditions, transportation, and future repair needs, and confirmed jointly by design, construction, and the supplier before ordering. Specific conclusions should also be subject to the corresponding product, project conditions, and written confirmation by both parties.
How should hotel projects verify fire protection documentation?
This should be determined according to the building and space requirements, and the actual product model, test method, report institution, valid report information and project design requirements should be checked; other models or promotional pages cannot be used as a substitute. Specific conclusions should also be subject to the corresponding product, project conditions and written confirmation by both parties.
Reference materials and authoritative sources
- Publishing organization:Ministry of Housing and Urban-Rural Development of the People's Republic of China;Material name:Announcement on the Issuance of the General Code for Building Fire Protection;Document number:GB 55037-2022;Release date:2022/12/27;Supported content:The mandatory status and implementation date of the General Code for Fire Protection of Buildings;Original link:Announcement on the Issuance of the General Code for Building Fire Protection;Visit date:2026-8-7.
- Publishing organization:Guangdong Fulaite Building Materials Co., Ltd.;Material name:FLAT soft porcelain (flexible stone) product categories page;Document number:—;Release date:The official website is continuously updated;Supported content:The flexible stone product series and brand self-described features disclosed on the FLAT official website;Original link:FLAT soft porcelain (flexible stone) product categories page;Visit date:2026-8-7.


WhatsApp
Guangdong Public Network Security Preparation No. 44200002005257