First look at the conclusion
When soft porcelain is used in an exterior wall insulation system, "can be adhered" must not be understood to mean it can be applied directly to an exposed insulation board. The finish methods permitted by the insulation system should first be clarified, and then the substrate, matching bonding materials, detail construction and on-site acceptance requirements should be verified.
Parts of the insulation system requiring joint confirmation
- Confirm whether the system design permits the use of this type of finish, and obtain the corresponding supporting documents.
- Check the compatibility between the crack-resistant protective layer, reinforcing mesh, bonding layer and finish; structural layers required by the design must not be omitted.
- First make a mock-up consistent with the site, and check bonding quality, joints and door and window closures according to project requirements.
| Checklist item | Information or conditions to be confirmed |
|---|---|
| System design | Facing type, applicable location, and construction drawing |
| Substrate condition | Strength, flatness, hollowing and moisture conditions |
| Basis for acceptance | Supporting material documentation and project inspection records |
Why can't we discuss only whether the surface of the insulation board can be adhered to
An exterior wall insulation finish is a system in which multiple construction layers work together. The insulation material, crack-resistant protective layer, reinforcement material, bonding layer, finish and joints need to be compatible. A successful local trial bond cannot replace confirmation of the entire system and project requirements.
Inspect the existing wall surface and the new insulation system separately
For new systems, the design-permitted finishing method and construction documentation should be verified; for existing systems, hollowing, powdering, leakage and the condition of the original finish must also be investigated. A new finish should not be applied directly over the existing one until the substrate's load-bearing and bonding conditions are confirmed.
How to organize samples after confirmation
The project designer, construction party and relevant material parties shall clarify the matching and details, and the mock-up shall include the plane, joints, openings and corners. Keep on file the material model, substrate treatment, construction conditions and inspection results, and then decide whether to proceed with subsequent construction.
Scope of This Page and Materials
| Checklist item | Information or conditions to be confirmed |
|---|---|
| Discussion topics | Can soft porcelain be applied over exterior wall insulation boards? First verify the complete system construction |
| Material category | Flexible stone |
| Nature of the material | Material selection notes; specific performance is subject to the corresponding product documentation and reports |
Original images and videos

Material source and scope of application
- Corresponding product and sample information
- FLAT original certificates and test reports
- National Standards Information Public Service Platform: JG/T 311-2011 "Flexible Facing Brick"
- Ministry of Housing and Urban-Rural Development: Notice on Prevention and Treatment of Common Quality Problems in Affordable Housing (2022)
This article is a material selection and documentation verification note. The table lists items to be confirmed and does not indicate that the corresponding product has obtained a certain value or grade. Standard inquiries are only used to verify material categories and scope of application and do not mean that all FLAT Fulaite products are tested according to the same standard.