First look at the conclusion
The construction environment and curing conditions affect bonding or film formation. For specific temperature and humidity, open time, and recoating interval, refer to the technical data for the corresponding material; a single value cannot be uniformly given for all soft porcelain adhesives or stone-like coatings.
What environmental conditions need to be recorded on site?
- Record the environment and substrate conditions, and check recent rainfall, condensation and temperature changes to arrange a continuous workable construction window.
- Control the mixing quantity and working time according to the product instructions; do not add extra water or force heating to compensate for inadequate conditions.
- After completion, carry out finished-product protection, and proceed to subsequent processes only after confirming that curing conditions are met.
| Checklist item | Information or conditions to be confirmed |
|---|---|
| Environmental records | On-site temperature and humidity, rain and condensation conditions |
| Technical data | Construction conditions, open time, and curing requirements |
| Process arrangement | Inspection before recoating or laying, and subsequent protection |
Scope of This Page and Materials
| Checklist item | Information or conditions to be confirmed |
|---|---|
| Discussion topics | FLAT: How long does exterior wall stone-like paint material take to dry after opening |
| Material category | Stone imitation paint |
| Nature of the material | Material selection notes; specific performance is subject to the corresponding product documentation and reports |
Original images and videos

Material source and scope of application
This article is a material selection and documentation verification note. The table lists items to be confirmed and does not indicate that the corresponding product has obtained a certain value or grade.