Real stone paint construction process and preparation work

Release: Corporate NewsFLAT Official Website

Real stone paint is a coating whose decorative effect closely resembles marble and granite. It is mainly formulated from natural stone powder of various colors and is used for imitation stone effects on building exterior walls, so it is also called liquid...

Real stone paintIt is a coating whose decorative effect closely resembles marble and granite. It is mainly formulated from natural stone powder of various colors and is used on building exterior walls for a stone-like effect, so it is also called liquid stone. So how is it applied? What should the process be? Next, let us introduce it to you one by one!


First: preparations

1. Before application, fully understand weather changes and make protective preparations:

(1) The temperature should be above 5 degrees Celsius.

(2) The suitable air humidity for construction is 60%-70%; construction must not be carried out when humidity is above 85% or on rainy days.

(3) If it rains within 6 hours after construction, covering measures should be taken.

(4) Real stone paint must not be sprayed when the wind force is above level 4.


2. Construction tools

Air compressor, dedicated spray gun for stone paint, primer and topcoat spray guns, knives, putty knives, ink markers for layout, rulers, adhesive tape, mixers, base cement, sandpaper, wires, sockets, newspapers for protection, etc.


II. Construction methods

1. Substrate requirements:

(1) One-to-one cement mortar, plastered and cured for more than 15 days; the troweled surface must be flat but not too smooth, and the cut edges must not be too sharp.

(2) Before construction, the cement surface or the surface to be coated must be free of moss, grease or other contaminants; if present, they must be completely removed, otherwise adhesion will be affected, and the surface must be kept fully clean.

(3) If the surface is coated with old paint, the surface to be coated must be tested or confirmed to allow adhesion before construction; otherwise, it must be removed.


2. Primer application and sealing treatment

All coated objects must be primed and sealed to prevent bleeding and moisture penetration contamination.Real stone paint, the primer consumption per coat must be above 0.3kg/m2 until there is completely no bleeding.

3. Setting out and marking lines

For the ink line already drawn, first use a straightedge or marking line to make a straight-line mark.

4. Apply line tape

When applying tape, first apply the vertical lines, then the horizontal lines; at the joints, iron nails may be driven in so that the tape source can still be found after spraying.

5. Spraying real stone paint

Start sprayingReal stone paint, spray thickness 2-3mm, air pressure at 6-8kg/m2. During spraying, items not to be sprayed must be covered with newspaper or completely isolated with tape. After spraying, harden for 24 hours; the sprayed surface must match the appearance of the sample; spray 2 coats, with a consumption of about 3.5kg or so/ m2.


The amount of primer sprayed is about 0.25kg/m2. The topcoat must be sprayed after the real stone paint has dried thoroughly for 24 hours, at about 0.25kg per square meter. 6. Remove the line tape

Remove the tape immediately after spraying. Tape removal must be done carefully and must not affect the cut edges of the coating. When removing, pull upward as much as possible; do not pull forward.

7. Grinding

In sprayingReal stone paintBefore applying the topcoat, sand down approximately 30–50% of the sharp-angled particles on the real stone paint surface. This enhances the aesthetic appeal of the real stone paint, reduces sharpness, and prevents dust accumulation. After sanding, use a spray gun with strong air to blow away dust that could affect adhesion.

8. Fully spray the topcoat.

PendingReal stone paintAfter fully hardening for 24 hours, the clear topcoat can be sprayed over the entire surface, requiring at least 0.3 kg per square meter.

III. Notes

(1) Before applying the topcoat, be sure to confirm that the real stone paint is completely dry; this is often the key to successful construction.

(2) Depending on the spray application requirements, the viscosity of real stone paint can be adjusted with clean water; test-add from less to more, and be sure not to add too much; this step is best handled by an experienced person.

(3) Before each spraying session begins, a trial spray should be carried out on a test panel in advance, and adjustments should be made according to the spray output. Only after confirming that the hue, spray width and other aspects are all satisfactory should formal spraying begin.

(4) If workers are not yet skilled at spraying in the early stage of the project, they should test-spray on the rear wall or an inconspicuous area, and only move to front-facing spraying after becoming proficient.

(5) Color unevenness is relatively likely to occur at spray joints, so after finishing one section, the next section should be coated as early as possible.

(6) To minimize color difference as much as possible, the required materials should be ordered in a single order.

Advantages of systematic construction of real stone paint

GuangdongFLATAs a supplier of systematic solutions for building exterior facade systems, the building materials company has always adhered to the premium-quality route. After 22 years of industry accumulation, it truly possesses the capability and strength to build premium-quality projects, whether in products or in design and construction.

Well, the above is a brief introduction for all friends on what preparations to make before construction. I hope it can help you all!

Party and information verification

Party:Guangdong Fulaite Building Materials Co., Ltd. · FLAT. / Company Introduction

When the text involves standards, inspections or material parameters, please verify against the original materials listed in the text and the corresponding product conditions. The original samples and reports can bePage of qualifications and inspection reportConsult; models, batches, and project conditions are different, and relevant data should be confirmed separately.

For engineering cooperation and import and export procurement, you can provide the location, required area and intended texture,Contact FLAT for samples and quotes。

FLAT · Guangdong Fulaite Building Materials Co., Ltd.

Make architecture more beautiful.

Focus on flexible stone (MCM soft stone/soft porcelain), providing texture selection, product information and order production coordination.

Copyright © 2012-2026 Guangdong Fulaite Building Materials Co., Ltd. All Rights Reserved Yue ICP No. 16084041

Headquarters Address:No. 2, West of Tong'an Avenue, Dongfeng Town, Zhongshan City, Guangdong Province
Public Security RecordGuangdong Public Network Security Preparation No. 44200002005257