Guangxi Beiliu City Impression

Project Collection · Material Application FLAT · Guangdong Fulaite Building Materials Co., Ltd.

Beiliu City Impression, GuangxiA single high-rise building is combined with a mountain backdrop; darker colors are used on the roof section and base to emphasize the building's outline. This page retains the original site's project gallery and, together with the current product catalog, organizes the key points for material selection and construction verification for similar scenarios.

Residential and communityProject drawing set and material selection analysisOriginal station planning rendering

Material summary and boundaries of the original records

Project and material selection information summary
FieldRecords
Material nameBeiliu City Impression, Guangxi
Nature of the contentOriginal site project archive and material selection analysis for similar scenarios
Image natureOriginal station planning rendering
Original record materialsOriginal station does not specify the specific material model
Comparison of the current catalogLight gray travertine、Yellow travertine、A face brick 2
Material compilation date2026-11-09

When reading this page, please understand the original project records, current product information and material selection recommendations separately. The original site did not disclose the area, supply batch, construction date, material thickness or on-site test results, and these are not inferred from images; similar products in the current catalog are an entry point for sample inquiries and comparison, and cannot be taken as confirmation of the actual supply model of historical projects. For entries with planning renderings, sand tables or construction-phase images, do not describe them as proof that the entire project has been completed or accepted.

Image interpretation: material selection from the perspective of elevation and application location

Beiliu City Impression, Guangxi: Figure 1 | Original site planning rendering. A single high-rise is combined with a mountain backdrop, with darker colors on the roof section and base emphasizing the building outline.
Figure 1 | Planning rendering from the original site. A single high-rise is combined with a mountain backdrop; darker colors are used on the roof area and base to emphasize the building outline.

A single high-rise combined with a mountain backdrop, with darker colors used on the roof and base to emphasize the building outline. Such images are suitable for first observing the building massing, main colors and finish zoning, then narrowing the focus to entrances, doors and windows, and adjacent components. Shooting distance, exposure, lighting and obstructions all change how texture appears; a wall that looks flat in a photo may not use the same material, and areas that look darker may simply be shadow. The material composition or measured parameters that are not indicated cannot be inferred from the image.

For the same location, it is advisable to prepare far-view, close-up, and detail records at the same time. Far views are used to confirm large-area proportions, close-ups to check texture and joints, and detail records to explain specific practices such as window sills, corners, and top protection. The images currently provided on the original site each have their own observation scope; the captions in this article only describe what can be seen. When judging color, bonding reliability, material grade, or project completion status, samples, drawings, and project records should be checked separately.

Key points for material selection in residential and community projects

Walls in residential and community projects usually have to address three scales at once: distant views, entrances and residents' daily contact. From afar, what matters is whether the base tones between buildings are coordinated and whether vertical lines are continuous; after entering the community, the zoning of lobbies, podiums and perimeter walls becomes the visual focus; only when close to the wall do joints, edge trims and surface cleanliness truly become apparent. Therefore, material selection should not rely on comparing the color of a single sample against a distant photo of the building. Instead, separate schedules should be built for large areas, bases and entrances, specifying the materials, details and maintenance responsibilities for each.

Different orientations within the same community should not simply copy the same approach. The lower edge of balconies, areas near air-conditioner platforms, behind ground-floor landscaping, and roof coping locations may differ in exposure to water, shading, and cleaning conditions. During design communication, these locations can be marked on the elevation drawings, and then a decision made on whether different termination, protection, and maintenance arrangements are needed. Shadows in photos may come from components or the time of shooting; not all dark areas should be interpreted as color differences of the material itself, nor should long-term weather resistance be judged from a single completed-project photo.

Supplementary drawings and mock-up observation

Beiliu City Impression, Guangxi: Figure 2 | Original site planning rendering, with additional observation of the building massing, color zoning and surrounding relationships in this entry; specific materials and construction status are subject to the original records and on-site verification.
Figure 2 | Planning rendering from the original site, providing additional observation of the building massing, color zoning and surrounding relationships of this entry; the specific materials and construction status are subject to the original records and on-site verification.
Beiliu City Impression, Guangxi: Figure 3 | Original site planning rendering, with additional observation of the building massing, color zoning and surrounding relationships in this entry; specific materials and construction status are subject to the original records and on-site verification.
Figure 3 | Planning rendering of the original station; use it to further observe the building volume, color zoning and surrounding relationships of this entry; the specific materials and construction status are subject to the original records and on-site verification.
Guangxi Beiliu City Impression: Figure 4 | Original site planning rendering; supplement observations of this entry's building massing, color zoning and surrounding relationships; specific materials and construction status are subject to the original records and on-site verification.
Figure 4 | Planning rendering of the original station; use it to further observe the building volume, color zoning and surrounding relationships of this entry; the specific materials and construction status are subject to the original records and on-site verification.

Material comparison: name, texture, and usage conditions

Flexible stone is organized on this website under names such as MCM soft stone and soft porcelain. The catalog includes split brick, travertine, slate, rammed earth, cloth-texture stone, art soft porcelain and inorganic ink printing series. Here the series are primarily used to distinguish textures and decorative effects and should not be understood as meaning that all styles share the same thickness, weight or performance grade. Even when color names are the same, different substrates, specifications and surface relief may produce different appearances and installation conditions, so the data corresponding to the specific item number must be checked.

When discussing brick textures, a particular distinction should be made between flexible split-brick finishes and traditional fired bricks or other ceramic products. One cannot assume, based solely on a name such as "A-face brick," that the material is necessarily split from fired brick, nor can the water absorption or construction experience of hard ceramics be transferred to MCM products. The recommended links on this page are material-selection entry points in the current catalog; unless the original project documentation explicitly states a model, do not directly write products with the same name or similar texture as the products actually used in this project.

When evaluating flexible finishes, the facing material, bonding material, substrate and joints should be checked as a matched system. Thin materials still require suitable leveling, reliable bonding and correct detail treatment; "light" and "thin" cannot replace structural safety verification. Where external walls, heights, insulated substrates or special exposure conditions are involved, project designers and construction personnel should confirm system applicability, and the corresponding sample boards and inspection records should serve as the basis for specific practices.

For similar buildings, texture, specifications and construction conditions can be compared between flexible stone and stone-look paint, but the two are not products that can be swapped based on color alone. If the original record has no accurate model, samples should first be requested according to the actual application area on site, and styles from the current product catalog should not be directly applied to historical projects. Establishing a comparison checklist first and then confirming the plan helps avoid situations where products "look similar" but cannot be matched in auxiliary materials, edge finishing or maintenance.

Products in the current catalog are available for sample requests; they do not represent the actual models used in the original project.
ProductsMaterial descriptionApplication
Light gray travertineFLAT Fulaite light-grey travertine has porous textures of varying sizes distributed across the surface, with variations in density and depth; the laying direction and joints affect overall continuity. It can be used for material evaluation in hotel feature walls, homestay interior walls, and commercial display spaces. Production is based on confirmed samples and orders, with specifications, color codes, and delivery times confirmed order by order.Check the physical item, corresponding specifications and applicable conditions
Yellow travertineFLAT Fulaite yellow travertine has pore-like textures of varying sizes distributed across the surface, with variations in density and depth, and the laying direction and joints affect the overall continuity. It can be used for material selection evaluation for hotel feature walls, homestay interior walls, and commercial display spaces. Production is based on confirmed samples and orders, with specifications, color codes, and delivery times confirmed order by order.Check the physical item, corresponding specifications and applicable conditions
A face brick 2FLAT A-face brick 2 flexible stone selection information; the series is split brick. View this product's images and textures; dimensions, colors, surface effects and supply requirements are subject to the confirmed sample and order. Products are made to order; when selecting materials, contact the manufacturer to verify the technical data, applicable scenarios and lead time for the corresponding model.Check the physical item, corresponding specifications and applicable conditions

Specifications, dosage and calculation basis

Geometric area and actual purchase quantity should be calculated separately. For a single rectangular panel, the nominal area can be calculated as length multiplied by width; millimeter dimensions must be converted to meters. The net finished area should deduct openings that are to be deducted per the design and should account for corners, edge strips, and joints. Pattern matching, rotation, or cutting requirements for different textures may change the usable rate; the waste ratio of one material cannot be copied to all wall surfaces. Before the layout is determined, calculation results can only serve as communication examples.

For example, if only for calculation purposes, assuming the net area to be paved is one hundred square meters and the nominal size of a single piece is six hundred by one thousand two hundred millimeters, then the area of a single piece is zero point seven two square meters, and the theoretical whole-piece count without accounting for cutting and joints should be rounded up to one hundred thirty-nine pieces. This is not the actual usage for this project, nor does it include on-site cutting, spares, and packaging constraints; when actually placing an order, each face should be calculated item by item according to the layout list, and this calculation example should not be applied to strip bricks, coatings, or other specifications.

For coatings, the calculation should be based on the unit-area consumption, system layers and actual application method given in the corresponding product instructions; the panel-count formula should not be used. For transport weight, a distinction must also be made between the net weight per piece, the total net weight of materials and the gross weight including packaging and pallets; where the corresponding data is lacking, it should be requested and verified, and a fixed conversion factor must not be used to produce a seemingly precise transport tonnage. For products whose specifications are not disclosed, this page does not fabricate generic thickness, consumption or packaging parameters.

Color confirmation and layout review

Color confirmation should be based on actual samples, and the sample number, confirmation date, observation light and application location should be recorded. Photos, screens and printed catalogs are affected by exposure, display settings or paper, so they are suitable for preliminary communication but cannot alone serve as the basis for final color acceptance. It is recommended to observe the confirmed sample together with adjacent floors, doors and windows or trim lines, and where necessary to make a larger-area mock-up to confirm whether there is an obvious difference between the overall appearance and the small sample.

The layout drawing needs to mark the net wall dimensions, starting position, door and window openings, corners, expansion or deformation joints, and interfaces with adjacent materials. For directional textures, the rotation and joining sequence should be indicated; for brick patterns or grid coatings, first check whether the lines can be coordinated and terminated on both sides of doors and windows. Dimension verification should be completed after the constructible substrate has been formed, to avoid treating design nominal dimensions directly as final cutting dimensions.

Substrate inspection and auxiliary material matching

Substrate inspection should be completed before finish construction. It is necessary to record the substrate material, flatness condition, moisture or dampness, and whether there is loosening, hollowing, powdering, contamination and old coatings. Where cracks and water seepage are involved, the cause should first be identified and treatment implemented; simply covering with a finish layer is not advisable. Whether the substrate meets the requirements of a specific system cannot be judged from a single photo alone; it should be confirmed in combination with on-site inspection, applicable design documents and relevant product technical data.

The choice of auxiliary materials must correspond to the facing material, substrate and application environment. Adhesives, primers, leveling materials, and joint or sealing materials serve different purposes and should not be used interchangeably just because their names are similar. You may require the supplier to provide matching recommendations, usage conditions, construction limitations and corresponding documentation, and verify the specific combination through trial bonding or mock-ups. Parameters such as mixing ratio, open time and curing conditions for actual construction should follow the valid instructions of the product used; this article does not set fixed values that apply across series.

Corners, openings and construction nodes

Details should cover at least internal and external corners, window sills and opening edges, wall bases, top edge capping, through-wall pipes and conduits, and connections with other finishes. Water flow paths, drip details and end protection need to be considered at the design stage; all sealing tasks cannot be left to surface coatings or decorative sheets. If there is an insulation layer, special substrate or complex component, the connection and protection methods should be checked separately, and construction should be organized only after a professional has determined the applicable solution.

The construction process can be recorded step by step: substrate acceptance, sample confirmation, layout review, zoned construction, detail treatment, and finished-product protection. After each section is completed, check whether the actual material batch matches the confirmed sample, and verify whether the joint or splice positions conform to the drawings. When the on-site environment does not meet the requirements for the corresponding material, adjust the work schedule; do not omit necessary processes to rush progress, and do not directly use the construction duration of other projects as a delivery commitment for this project.

Purchasing orders and partial deliveries

The purchasing list should itemize by area, material, style number, color, specification, quantity and packaging unit, and be accompanied by layout and sample confirmation records. Quotation comparisons should use a consistent scope, distinguishing responsibilities for surface materials, auxiliary materials, substrate treatment, transportation, installation and acceptance; if different schemes are compared only by the unit price of surface materials, construction and maintenance differences are easily overlooked. Products on this website are produced according to confirmed samples and order requirements; this page does not publish a uniform price divorced from specifications and delivery conditions.

For batch deliveries, it is recommended to record the production batch, receipt date, and installation location corresponding to each building or wall zone, and to use confirmed batches for the same continuous visible area as far as possible. The quantity and storage method of reserved materials should be agreed in the order; a fixed percentage must not be used directly in place of layout calculations. Upon arrival, first check packaging, markings, quantity, appearance, and random samples, then handle anomaly records according to the agreement between both parties, to avoid losing traceability after unpacking and mixing.

Acceptance and use/maintenance

Acceptance needs to distinguish three levels: visual effect, material delivery, and construction quality. Color and texture should be compared with the confirmed sample; quantity and specifications should be checked against the order and delivery records; and the substrate, bonding, nodes, and protection should be inspected according to the applicable requirements. Photos can serve as process records, but they cannot replace necessary on-site testing, nor can sample laboratory reports directly prove that the entire building has achieved the same on-site performance. For indicators not covered by the test methods and scope, this should be stated truthfully.

The maintenance plan should be handed over before use, including permitted cleaning methods, chemicals or tools to avoid, inspection methods after impact, and color-difference handling for local repairs. For the first cleaning, try it first in an inconspicuous area and follow the specific product instructions; the same cleaning results cannot be promised for all textures. If problems such as cracking, hollowing, water seepage, or loose components occur, identify the cause first and then decide the scope of treatment; it is not advisable to merely cover the surface and consider the problem resolved.

How delivery documents correspond to test reports

It is recommended to archive the final delivery documents in four groups: confirmed samples and layout drawings, product and auxiliary material documents, construction process and inspection records, and maintenance and replenishment information. Each area should preferably be traceable to the corresponding batch and method, so that when repair needs arise later, records can be checked first and samples requested afterward, reducing color-matching deviations based on memory alone. The purpose of project documents is to explain the methods already confirmed, not to fill in data that was not measured or provided and present it as a polished engineering achievement.

For cross-regional projects, the actual environment and conditions of use should be added, for example whether the project is outdoors, whether it is exposed to rain, and whether there are salt-spray or frequent-cleaning requirements. For export procurement, product technical requirements, English safety data and transport documents also need to be checked separately; an appraisal for handling sea freight as non-restricted cargo does not mean the material has obtained building-use approval in the destination country. Domestic and overseas testing systems cannot be treated as directly equivalent merely because the grade names are similar; communication should be based on the documents actually adopted and their scope of application.

Material verification checklist
DocumentationInformation that can be supportedConclusions that cannot be directly derived
Product details and confirmation samplesCorresponding style, texture, specifications and agreed delivery requirementsCannot prove that historical projects actually used the same product
Corresponding test reportSamples, standards, conditions and results stated in the reportCannot prove the on-site performance of the entire building.
Construction drawings and acceptance recordsDesign approach, actual inspection, and delivery scopeCannot be replaced by renderings
MSDS and transport assessmentFor corresponding material safety information or transport review purposesNot building access certification for all countries and regions

Common questions about material selection

Can I place an order directly based on this set of images?
Images can help determine the style, but actual dimensions, application areas, substrate conditions and intended model numbers are still required. First check the samples and layout, then clarify specifications, packaging and delivery requirements, to avoid treating photo proportions as cutting dimensions.
Can different colors in the same series be mixed using the same parameters?
The corresponding model and production requirements should be checked. Texture, dimensions, thickness and surface treatment may differ; without confirmation, the data of one item number should not be extended to the entire series, and example parameters should not be treated as the actual values of every order.
Does a test report prove that this project has met the standard?
Laboratory reports correspond only to the samples and test conditions recorded in the report. Projects also involve substrates, auxiliary materials, construction, and details, which should be checked against actual design and acceptance requirements; the report links in the article do not replace project acceptance documents.
How should different supply plans be compared?
List the same application location, sample effect, specification, auxiliary materials, transportation, installation and maintenance scope side by side, and confirm the boundaries of responsibility separately. For service life, cost savings or construction efficiency that lack supporting data, do not compare directly based on verbal descriptions.
What is the difference between application solutions and engineering cases?
Engineering entries retain the original site's project names and images and explain the scope of existing materials; application plans provide design and material selection ideas based on the product catalog. When there is no real project information, do not fill in fabricated customer names, addresses, or completion data.
How can I obtain further information about this material?
You can provide the intended model numbers from the product links below, and specify the project location, indoor or outdoor area, net dimensions, substrate and lighting conditions. After requesting the corresponding specifications, samples, test reports and installation recommendations, proceed to sample and order confirmation.

Products and original document entry

Sources include the original project descriptions and photographs on this website, current product pages, and company-supplied specifications and original test reports. The material was compiled on November ninth, two thousand and twenty-six. Project identities and quantities are recorded only as stated in the available documents; missing independent measurements or delivery records have not been presented as verified project achievements. Consult the original documents for performance data, certificate scope and report purpose, and confirm them alongside the sample, order and project specifications.

This page retains the original project images from the original site; planning renderings, sand tables, and construction-stage images have been noted as such. The specific supply and application scope shall be subject to the original project documentation and documents confirmed by both parties.

FLAT · Guangdong Fulaite Building Materials Co., Ltd.

Make architecture more beautiful.

Focus on flexible stone (MCM soft stone/soft porcelain), providing texture selection, product information and order production coordination.

Copyright © 2012-2026 Guangdong Fulaite Building Materials Co., Ltd. All Rights Reserved Yue ICP No. 16084041

Headquarters Address:No. 2, West of Tong'an Avenue, Dongfeng Town, Zhongshan City, Guangdong Province
Public Security RecordGuangdong Public Network Security Preparation No. 44200002005257